INDEX
Sportsfield Case Studies
Client: Birmingham City F.C.
Project: Installation of a secondary drainage scheme at St Andrews, the home of Birmingham City F.C.
*
Stage 1: A sand banding scheme was applied to compliment the existing piped drainage system & take the pitch to the highest possible standard
Stage 2: Narrow slits were constructed at right angles to the existing drainage and filled with gravel and sand
Stage 3: The bands were spaced closely to allow surface water to enter the piped drainage system faster
Stage 4: Minimal damage allows
the pitch to recover quickly
* Secondary drainage can only work in conjunction wuith an existing primary or piped scheme
PROFILE
PLANT LIST
WATER MANAGEMENT
SERVICE
CASE STUDIES
HOME
CONTACT
SPORTS FIELD DRAINAGE SERVICES • SPORTSFIELD DRAINAGE • MIDLANDS DRAINAGE CONTRACTORS • DRAINAGE • LAGOONS • FARM ROADS • DITCHING • RESERVOIRS • MOLEING • SUBSOILING • FOOTBALL PITCHES, HOCKEY PITCHES • GOLF COURSES 8 RECREATION GROUNDS • PLAYING FIELDS • ATHLETICS FACILITIES •
LINKS TO RELATED SITES